Client
Date
30.12.19
Service
BMS Design, Install & Consultation
Sector
Construction
Rating
Completed: December 2019
110 High Holborn is a multi-tenanted building with a distinctive glass frontage, provides contemporary office space with lots of natural light, over 1st to 8th floors. 110 High Holborn is located in a prominent position on the north side of High Holborn spanning across the junction with Procter Street. The location benefits from access to both the Central and Northern lines and will have access to Crossrail when complete.
Intech Controls were employed directly by Collins Construction, the appointed main contractor and did in fact work directly for Collins on this project. Collins Construction aims to create the perfect workspace. They deliver high quality fit outs & refurbishments within the healthcare, workplace, retail, leisure and education sectors, which exceed expectations through perseverance and the experience of their motivated, flexible and focused teams.
During the 16 week program, Intech Controls were tasked with providing a full turnkey upgrade solution from the existing chilled beams to fan coil units, right through from design to project management, delivery, handover and system training for the client.
Opting for the latest Trend IQeco fan coil controllers, Intech designed and delivered a brand new Building Management System for control of 137 Quartz fan coil units across floors 2, 3 and 4.
The landlord system is also Trend and the schematic pages were integrated into the existing BMS head end / supervisor which is currently Trend IQVision. Form 1 type panels were installed in the risers and a panel mounted 15” Vorex touch screen display allows engineering access to the BMS from the riser cupboard.
Given the nature of the site, the building remained fully operational during the entire 16 week program which added a unique challenge to the delivery process.
By collaborating across the supply chain, the project was delivered on time and on budget with minimal impact to the client.